GhostNet 1.5, page 25
GhostNet Guide
S2 Underground field guide: GhostNet Guide
Version 1.5 — Stopgap Comms Solutions (CC BY-NC-SA 4.0)
Searchable page text (OCR / PDF)
25
Basic Incident Response
Immediate Concerns
Step 1: Physical Security
Don’t Panic. Establish personal security FIRST! All other comms and incident response actions can wait
until you are secure. If security is not guaranteed, some level of tactical comms might be prioritized over
personal safety, depending on the tactical situation and the nature of the emergency.
Step 2: Establish Comms, Determine Players, Send 5 W’s
Once personal safety is established, the originator of the incident/distress call shall make every effort to
establish a communications net and transmit a brief description of the incident. The 5 W’s of Who, What,
When, Where, and Why are a good format to stick to, if no other format exists. If a Troops-in-Contact
report, or a SALUTE report is preferred, use that format instead. If the originator of the incident report is
unable to establish an Incident Response Comms Net, other Net participants shall make every effort to
coordinate a response as needed. As a prepared citizenry is often non-hierarchical, there are no Command
requirements (beyond local group SOPs), so whomever is capable of maintaining the Nets and passing
communications, is the primary party responsible for such action until no longer able.
In the more likely scenario of a person simply hearing of a national event, and wishing to obtain more
information, tuning in to the appropriate radio communications net would be a good idea. Chances are, if
something substantial is going on, people will be sharing information on the GhostNet.
Battle Tracking
Step 3: Establish TOC, Staff Functions Begin
A Tactical Operations Center, appropriate to the incident, is to be established as needed. All staff functions
begin to work the issue as their skillsets and capabilities allow. Intelligence and Operations maintain the
primary responsibilities of Threat Assessments and Friendly Forces, respectively. Logistics, Weather, Med-
ical, Administrative, and dedicated Communications experts also contribute as able. Amongst a prepared
citizenry, most of the standard TOC functions (such as Battle Tracking) will fall to a single person. Do the
best you can, and realize that perfection is not possible. Realistic expectations of operational capabilities
are paramount to maintaining even the smallest measure of effectiveness.
Once a good Battle Rhythm is established, start working on improving effectiveness. Try to improve
communications networks, and get some of the more advanced options (like Ion2G ALE or Winlink) up
and running to make contact with personnel near the affected area. These more advanced actions take
time, and will not be possible to create prior to the incident. Even though very basic comms are the bare
minimum, highly efficient data exchange networks will need to be the eventual end goal if time, skill, and
prior planning makes it possible.
Follow-On Actions
Step 5: Hotwash, After Action Review, Logistical Recovery
As an incident comes to a close, or begins to settle in for the long haul, logistical capabilities must be
considered. Personnel issues will be paramount as prepared citizens often are not capable of assisting
with incident recovery 24/7. Conducting Hotwashes/AAR’s will help increase efficiency, identify deficiencies,
and improve response efforts for the next incident.
Step 4: Reassess Situation and Response, Schedule 2-Minute
Drills, Assess Logistical/Personnel Needs
As the incident progresses, people fall into the roles they have trained for. As a citizen-based response will
not have a strong Command element like traditional Incident Command Structures, consideration must
be given to logistical and personnel constraints that will affect operations. Ensure that clear schedules
are communicated. For multi-day incidents be aware that personnel tracking incidents will be volunteers
with other obligations which might dictate their retirement from the operation at a critical juncture. Create
a template and a schedule for Two-Minute Drills, which allow each responding entity to convey a status
update from their department quickly and efficiently. Be mindful of logistical needs, particularly energy
requirements. Maintain flexibility as plans change.