AFDD 2-1.9, page 52
Targeting
Air Force Doctrine Document: Targeting
DTIC ADA454614 public copy
Searchable page text (OCR / PDF)
42
definition found in JP 1-02) The MAAP is usually presented in the form of a decision
briefing for the CFACC. The CPD MAAP team is responsible for producing the MAAP.
The sortie allotment message (SORTIEALOT) is a means by which the CFC can
allot sorties to meet requirements of subordinate commanders that are expressed in
their air employment and/or allocation plans. It may or may not be produced during this
phase of the tasking cycle, based on availability of limited air resources and component
requirements.
ATO Production and Dissemination
Purpose of the Phase
This phase finalizes the ATO and associated orders, physically produces them, and
disseminates them to combat units. It is based on commanders’ guidance (especially
the AOD), the MAAP, and component requirements. This is accomplished by the CPD
ATO production team. Airspace control and air defense instructions must be provided
in sufficient detail to allow components to plan and execute all missions listed in the
ATO. These are usually captured in the airspace control order (ACO) and the day’s
SPINS. These directions must enable combat operations without undue restrictions,
balancing combat effectiveness with the safe, orderly, and expeditious use of airspace.
Instructions must provide for quick coordination of task assignment or reassignment and
must direct aircraft identification and engagement procedures and ROE appropriate to
the nature of the threat. These instructions should also consider the volume of friendly
air traffic, friendly air defense requirements, identification friend or foe technology,
weather, and adversary capabilities. Instructions contained in the SPINS and the ACO
are updated as frequently as required. The ATO, ACO, and SPINS provide operational
and tactical direction at appropriate levels of detail. The level of detail should be very
explicit when forces operate from different bases and multi-component and/or
composite missions are tasked. By contrast, less detail is required when missions are
tasked to a single component or base. Components may submit critical changes to
target requests and asset availability during this phase of the cycle.
Products of the Phase
The ATO is a method used to task and disseminate to components, subordinate
units, and command and control agencies projected sorties, capabilities and/or forces to
targets and specific missions. It normally provides specific instructions to include call
signs, targets, controlling agencies, etc., as well as general instructions. The ATO may
subsume the ACO and SPINS, or these may be published as separate orders.
SPINS are a separate instruction or section of the ATO that provides information
that is not otherwise available in the ATO, but is necessary for its implementation. It
includes such information as commanders’ guidance (often including the AOD itself),
the C2 battle management plan, ROE, combat search and rescue procedures, the