MCRP 12-10B.1, page 105
Military Operations on Urbanized Terrain (MOUT)
Marine Corps Reference Publication: Military Operations on Urbanized Terrain (MOUT)
Public distribution statement A; S2 KOCOA cited as MCRP 12-10 b.1
Searchable page text (OCR / PDF)
Sleep and alert plans
Security
Limited visibility
Control of noncombatants.
j.
The company should install a wire net and develop a plan for pyrotechnic signals to ensure
adequate communications. Backup wire should be laid in case primary lines are cut by
vehicles, fires, or the enemy. The commander also plans for the use of messengers .
3302. Delay in a Built-Up Area. A rifle company may be assigned the mission to delay in a
built-up area.(Figure 3-13). To perform this mission, a rifle company can destroy enemy
reconnaissance elements forward of the outskirts of the town, prevent their penetration into the
built-up areas, and gain and maintain contact with the enemy to determine the strength and
location of the main attack.
Figure 3-13. Delay in a Built-Up Area
a. Platoons delay by using patrols, OPs, and ambushes. Following each action, a platoon will
disengage and withdraw.
b. The company’s sector should be prepared with obstacles to enhance the delay. Engineers
should prepare obstacles on anticipated enemy main routes of advance.
MCWP 3-35
.3
3-33