JP 3-60, page 65
Joint Targeting
Joint Publication: Joint Targeting
31 January 2013 public edition
Searchable page text (OCR / PDF)
The Joint Targeting Cycle
II-35
e. The commander should be focused on the purpose of the fires with regard to creating
effects against chosen targets. Effects are more than the results of the fires. Effects are the
cumulative results of target engagements by lethal and nonlethal means. Once the target is
engaged, the commander must assess the effectiveness of the engagement. If the desired
effect was not created, the target may need to be reengaged or another method selected to
create the effect. There are many different ways to categorize effects. One important
distinction is between direct and indirect effects.
(1) Direct effects are the immediate, first-order consequences of a military action
(weapons employment results, etc.), unaltered by intervening events or mechanisms. They
In the previous example, the joint force air component commander (JFACC)
needs to preserve certain enemy airfields for friendly use after eliminating
the enemy air threat, because current friendly forward air bases are not near
enough for the desired level of support of impending ground operations. An
undesired effect of friendly’s offensive counterair operations would be the
destruction of runways at selected enemy airfields. In response to this,
either the joint force commander’s (JFC’s) or JFACC’s operational
limitations could include the constraint, enemy airfields A, B, and D must be
able to support friendly air operations by D+10. Refer to Joint Publication 5-
0, Joint Operation Planning, for more information on the use of operational
limitations during planning.
In the following example, the joint force land component commander
(JFLCC) designates two bridges that span Red River in the JFLCC’s area of
operations as high-priority targets for attack in the next 24 hours (by D+8).
The JFC approves the targets. The joint air operations center (JAOC)
analyzes the targets, selects aimpoints, munitions, and platforms, and
includes the missions on the air tasking order (ATO) for execution.
Missions are flown the following day, and battle damage assessment
indicates the bridges are damaged sufficiently to prevent foot and vehicle
traffic, the typical desired effect for this type of target. 12 hours later the
joint fires element (JFE) at the joint force headquarters tasks the JAOC to hit
the targets again. When JAOC ATO planners ask for clarifications, the JFE
explains that Red River—an interior line of communication for enemy
forces—is a main supply route. Apparently enemy forces use river barges
extensively for most classes of supply, including fuel and ammunition. The
JFLCC had established the desired effect: enemy forces cannot resupply
along Red River beginning D+8. But friendly ground forces are still
conducting entry operations 100 kilometers from Red River, and are not in
position to create this effect. JFLCC planners have determined that
completely dropping all spans of the two bridges will result in an obstacle
impassable to the river barges, thus creating the JFLCC’s desired effect.
With this understanding, JAOC planners adjust the aimpoints and munitions
to drop the spans of the two bridges, the target effect necessary to create
the JFLCC’s desired effect, although 36 hours later than expected.