s2underground_search · Manuals
Military manual MCRP 12-10B.1 Page 281 of 371 text: pdf

MCRP 12-10B.1, page 281

Military Operations on Urbanized Terrain (MOUT)

Marine Corps Reference Publication: Military Operations on Urbanized Terrain (MOUT)

Public distribution statement A; S2 KOCOA cited as MCRP 12-10 b.1

Page 281 of MCRP 12-10B.1
Searchable page text (OCR / PDF)
Figure C-7. Floor Plans of Brick Buildings (2) Box-Wall Buildings. Box-wall buildings often have reinforced concrete walls (Figure C-8), which are difficult to breach because of reinforcing bars. Therefore, the best way to enter is to blow down the door or to blow in one of the side windows. The floor plans of these buildings are predictable; clearing rooms is usually done from one main hallway. Interior walls are also constructed of reinforced concrete and are difficult to breach. The stairways at the ends of the building must also be secured during clearing. Figure C-8. Box-Wall Buildings Military Operations on Urbanized Terrain C - 9