s2underground_search · Manuals
Military manual MCRP 12-10B.1 Page 282 of 371 text: pdf

MCRP 12-10B.1, page 282

Military Operations on Urbanized Terrain (MOUT)

Marine Corps Reference Publication: Military Operations on Urbanized Terrain (MOUT)

Public distribution statement A; S2 KOCOA cited as MCRP 12-10 b.1

Page 282 of MCRP 12-10B.1
Searchable page text (OCR / PDF)
(3) Heavy-Clad Framed Buildings. Tanks can be used to breach a hole in heavy-clad framed buildings. Their floor plans are normally oriented around a stairway or elevator. this must be secured during clearing (Figure C-9). The interior walls of these buildings can be breached, although they may require use of demolitions. Figure C-9. Heavy-Clad Framed Buildings (4) Light-Clad Framed Buildings. Light-clad framed buildings (Figure C-10), can be cleared in the same manner as heavy-clad buildings. Secure the central stairway and clear in a circular pattern. Walls are usually thin enough to be breached with an ax. Figure C-10. Light-Clad Framed Buildings 7. Consolidation and Reorganization. Consolidation and reorganization of the assault force in a cleared building must be accomplished quickly to repel enemy counterattacks and to prevent the C - 10 MCWP 3-35 .3