s2underground_search · Manuals
Military manual MCRP 12-10B.1 Page 339 of 371 text: ocr+pdf

MCRP 12-10B.1, page 339

Military Operations on Urbanized Terrain (MOUT)

Marine Corps Reference Publication: Military Operations on Urbanized Terrain (MOUT)

Public distribution statement A; S2 KOCOA cited as MCRP 12-10 b.1

Page 339 of MCRP 12-10B.1
Searchable page text (OCR / PDF)
1 - 6 —H TS SSS MCWP 3-35 3 CAPITAL w HH [23] FRAME BEHIND BRICK WALL fea: ca Fa BUILDING EXCEEDS SIX STORIES WINDOWS SAME DEPTH THROUGHOUT / ora, LARGE WINDOW AREA (IF SHAFT B B Bl Ho to r. BLOCK OFFICE OR STORE) Beas WINDOWS NOT RECESSED OUTER WALL THICKNESS BEHHB ack SAME THROUGHOUT MEZZANINE. 8 FR EB BG ER] BUILDING EXPOSED FRAME MEMBERS re EVE! z CLASSIC STYLING (PEDIMENT, PEDIMENT a SHAFT, CAPITAL) CENTRAL ENTRANCE Figure I-8. Heavy-Clad Framed Building GROUND FLOOR | i STORAGE, rent | SERVICES SHOPS SHAPE: SQUAREOR | RECTANGULAR | oat SIZE: LARGE ENOUGH | ey TO NEED LIGHT WELL | Li ENTRANCE LOCATION: | fe CENTER OR SIDE | SHOPS: NUMBER, SIZE, | SHAPE | ataw-b Le | | | | UPPER FLOOR | | | SHAPE: SQUAREOR | HAL RECTANGULAR | eal SIZE: LARGE ENOUGH TO NEED LIGHT WELL | “s | BLEV. ENTRANCE LOCATION: CENTER OR SIDE | Figure I-9. Floor Plan of Heavy-Clad Framed Office Building Figure I-8. Heavy-Clad Framed Building Figure I-9. Floor Plan of Heavy-Clad Framed Office Building I - 6 MCWP 3-35 .3